Final Semester – A Fresh Start

Hi Everyone,

It’s finally come to this… the last semester of my thesis research and development with Harrington. I’m sure I will continue on this work far beyond my time at Harrington, but now I am on the final stretch. I’ll be graduating in 13 weeks and I need to get some concepts nailed down!

A building has been decided on at least. The Cuneo Memorial Hospital, designed by Edo Belli in 1957. A very unique building, constructed during the heavy modernist period… probably much to the intrigue of other architects at the time, this is truly a one of a kind building! With the possibility of being torn down in the near future, I was immediately drawn to its interesting forms and masses. This will prove to be a challenging floor plan!

Cuneo_01     Cuneo_07

Still hashing out my final programming, it seems to change every time I work on my base drawings. I have a meeting with my thesis chair in about 2 hours, so I’m sure plenty will change then as well!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s